- Installation: First, the formwork panels are assembled according to the design size and shape, and then the supporting system and connection parts are installed. The formwork is hoisted into position by a crane and adjusted to the correct height and position.
- Concreting: After the reinforcement is placed, the concrete is poured into the formwork. During the concreting process, the formwork bears the pressure of the concrete and maintains its shape and position.
- Demoulding: After the concrete reaches the required strength, the connection parts are removed first, and then the formwork panels and the supporting system are removed in sequence.
Composition
- Formwork panels: Usually made of steel plates, they have high strength, good durability and smooth surfaces, which can ensure the surface quality of the tower columns.
- Supporting system: Composed of soldiers, jacks, etc., it is used to bear the pressure of the formwork and concrete and adjust the height and position of the formwork.
- Connection parts: Such as bolts and nuts, they are used to connect the formwork panels and the supporting system to ensure the integrity and stability of the formwork structure.