In the process of bridge construction, the Form Traveller is first installed at the initial section of the bridge pier. Then, the concrete of the bridge girder is poured in segments. After the concrete of one segment is poured and reaches the required strength, the Form Traveller is moved forward to the next segment position, and the concrete pouring construction is continued. Through such repeated operations, the entire bridge girder is constructed segment by segment.